Design and installation of sub-structure/super structures for re-signalling
Plus, civils work at 4 x level crossings extension works.
Client: Colas
RTL was awarded and have now commenced the design and installation of sub-structure, super structure, level crossings (civils), retaining walls and all associated lineside civils works supporting the Colas Life extension signalling project.
All plant and equipment supplied by Readypower Rail Services, and working collaboratively with the Colas Project team taking on some real challenges such as poor ground conditions which require innovative design solutions of deep foundations for level crossing equipment which generally is mounted on more shallow foundation arrangements.