As part of the Southend Regeneration Readypower was awarded a subcontract to install piled foundations for a new jetty, including:
- Breakout existing sea defence
- Install 457mm diameter and 610mm diameter CHS piles to 12 metre depth
- Install primary steel
Construction Phase
Readypower was selected to install the piles as due to the innovative method of install, it negated the need for a piling platform on a public beach. This was an environmental plus and also reduced enabling works. The flexibility of the piling system was key to achieving the 14 day programme. Being able to de-rig very quickly and move from incoming tidal water avoided large breaks in pile driving.
“Despite difficult conditions the team worked tirelessly and professionally throughout. The Terrawise kit is extremely flexible as was the overall attitude of the workforce – a pleasure to deal with.”
Project Director, FPE
We’re here to help
For more information or to enquire about a service call 0118 9774 901, or call our 24 Hour on Call number 0800 0902407, or email us