Emergency Earthworks

Sector: Rail

Client: Catenary King / Network Rail

Following storm Ciara and Dennis in Feb 2020, Readypower Terrawise was mobilised with 48 hours notice to plan and install a sheet piled wall to retain a railway embankment

  • Provision of all labour, RRV plant and piling plant
  • Provision of POS planning and management
  • Installation of 40 number, 9 metre sheet piles

Construction Phase

The works were delivered during 1 weekend emergency possession utilising 3 RRVs, Movax SG and BSP DX hammers

All works were complete without incident allowing the passage of trains to recommence safely.

Download Case Study

We’re here to help

For more information or to enquire about a service call 0118 9774 901, or call our 24 Hour on Call number 0800 0902407, or email us